The Site Allocations and Development Policies Document (SADPD) is part two of the Local Plan and identifies additional sites for development throughout Cheshire East.  It will be presented to the Strategic Planning Board at the end of August – followed by a six week public consultation from 11th Sept.  The revised version will have a second public consultation then goes to an Inspector for approval (probably) in 2019.  The housing figure for Goostrey is low due to its location in one of the most sensitive areas for radio interference for the Jodrell Bank Observatory.”

A Settlement Report  on Goostrey supports the overall SADPD..here are some extracted relevant points:    “…it is recommended that no sites should be allocated in the SADPD for development in Goostrey.”

2.1 Goostrey is a village with its own settlement boundary, set in the Open Countryside, as defined on the Proposals Map of the Congleton Borough Local Plan First Review, adopted in 2005. It is identified as a Local Service Centre (“LSC”) in the adopted Local Plan Strategy (“LPS”), and has a 2016 mid-year population estimate of 3,800 people.  [LG: yes we disagree with it being an LSC and all know that Goostrey village does not have 3800 residents !]

2.1 The focus for Goostrey over the LPS period is that of limiting any further impact, exacerbated by development, on the globally important work being carried out Jodrell Bank Observatory. It is also anticipated that Goostrey’s development needs will be largely provided for in Holmes Chapel (LPS ¶8.34).

Settlement Report Aug 2018.png

3.7  There were 8 housing completions (net) in Goostrey between 1 April 2010 and 31 March 2017, and 0.00ha employment land take up. Commitments as at 31 March 2017 were 8 dwellings and 0.00ha of employment land.  A planning permission for 38 dwellings, granted by Cheshire West and Chester Council, does not technically count towards Cheshire East’s figures, however, in a practical sense the proposed development will also be part of Goostrey, and therefore should not be ignored in the context of considering the village’s growth.

3.8  Taking into account existing completions/take up and commitments, this leaves a remaining requirement for the provision of 0 dwellings and 0.00ha of employment land over the remaining Plan period.

4.7  Goostrey has small centre with limited services. However, it has representation from all of the respective retail and service sectors, which provides a key resource to local residents. There is a vacant unit that reduces the vitality of the centre, given the small number of overall units. Although Goostrey has a lower level of retail and service units than expected in a LSC, it is recognised that the centre provides an important role in catering for the day to day needs of the local community and as such support its designation as a local centre (“LC”).

To read the whole report click here – Goostrey Settlement Report.

It is certainly interesting to see the Allocations throughout all the Local Service Centres:Draft SADPD 2.2.png

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s