Booth Bed Lane closed 1-5th and 8-11th April

A section of Booth Bed will be closed for up to 5 days from the 1st April due to work on overhead cables and 4 days from 8th April: closures between Brick Bank Lane and Boots Green.

“Nothing in the Order shall prevent driving upon the said lengths of road of any vehicle which is being used for the conveyance of persons goods or merchandise to or from any premises situate on or adjacent to the lengths of road or in connection with agriculture building construction works of repair and the like or use in an emergency of vehicles for fire brigade ambulance or police purposes. A through route will not always be available and any vehicles not requiring access to properties on the length of road should use alternative routes.” TRO2292 and TRO 2299.

Booth Bed Lane closure

Share and Enjoy !

0Shares
0 0 0

Comments

Leave a comment

Your email address will not be published. Required fields are marked *